A modified M1 Abrams tank lines up to cross an Improved Ribbon Bridge (IRB) erected in a testing basin at the U.S. Army Engineer Research and Development Center (ERDC), Sept. 1, 2021. Researchers from the ERDC are testing the high military load capacity vehicle weight limits of the IRB to determine under what operational conditions they can safely cross.
Date Taken: | 09.01.2021 |
Date Posted: | 07.01.2022 15:16 |
Photo ID: | 7292145 |
VIRIN: | 210901-A-FA501-011 |
Resolution: | 4377x2918 |
Size: | 3.65 MB |
Location: | VICKSBURG, MISSISSIPPI, US |
Web Views: | 73 |
Downloads: | 10 |
This work, Testing the limits of the Improved Ribbon Bridge [Image 4 of 4], by Carol Coleman, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.