Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Testing the limits of the Improved Ribbon Bridge [Image 3 of 4]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    Testing the limits of the Improved Ribbon Bridge

    VICKSBURG, MISSISSIPPI, UNITED STATES

    02.24.2022

    Photo by Carol Coleman 

    U.S. Army Corps of Engineers, Engineer Research and Development Center   

    Dr. Duncan Bryant, a research hydraulic engineer with the U.S. Army Engineer Research and Development Center’s (ERDC) Coastal and Hydraulics Laboratory, lines up a model tank on a scale model of the Improved Ribbon Bridge (IRB), Feb. 24, 2022. Researchers at the ERDC are using physical modeling as part of an effort to test the high military load capacity vehicle weight limits of the IRB to determine under what operational conditions they can safely cross.

    IMAGE INFO

    Date Taken: 02.24.2022
    Date Posted: 07.01.2022 15:16
    Photo ID: 7292147
    VIRIN: 220224-A-FA501-001
    Resolution: 4032x3024
    Size: 1.52 MB
    Location: VICKSBURG, MISSISSIPPI, US

    Web Views: 57
    Downloads: 11

    PUBLIC DOMAIN