Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Testing the limits of the Improved Ribbon Bridge [Image 2 of 4]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    Testing the limits of the Improved Ribbon Bridge

    VICKSBURG, MISSISSIPPI, UNITED STATES

    09.01.2021

    Photo by Carol Coleman 

    U.S. Army Corps of Engineers, Engineer Research and Development Center   

    A modified M1 Abrams tank crosses an Improved Ribbon Bridge (IRB) erected in a testing basin at the U.S. Army Engineer Research and Development Center (ERDC), Sept. 1, 2021. Researchers from the ERDC are testing the high military load capacity vehicle weight limits of the IRB to determine under what operational conditions they can safely cross.

    IMAGE INFO

    Date Taken: 09.01.2021
    Date Posted: 07.01.2022 15:16
    Photo ID: 7292146
    VIRIN: 210901-A-FA501-015
    Resolution: 4377x2918
    Size: 4.23 MB
    Location: VICKSBURG, MISSISSIPPI, US

    Web Views: 59
    Downloads: 7

    PUBLIC DOMAIN