U.S. Air Force Senior Airman Zane Geiger, 325th Civil Engineer Squadron customer service operator, reviews a map of the installation at Tyndall Air Force Base, Florida, July 6, 2022. The 325th CES manages all construction projects in progress around the installation. (U.S. Air Force photo by Airman 1st Class Tiffany Del Oso)
Date Taken: | 07.06.2022 |
Date Posted: | 07.14.2022 14:33 |
Photo ID: | 7316556 |
VIRIN: | 220706-F-DB615-1006 |
Resolution: | 6048x4024 |
Size: | 3.25 MB |
Location: | TYNDALL AIR FORCE BASE, FLORIDA, US |
Web Views: | 47 |
Downloads: | 7 |
This work, Civil Engineering and what it takes to build an "Installation of the Future" [Image 4 of 4], by SrA Tiffany Del Oso, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.