U.S. Air Force Senior Airman Zane Geiger, 325th Civil Engineer Squadron customer service operator, reviews a list of service requests at Tyndall Air Force Base, Florida, July 12, 2022. Each service request needs to be prioritized based on importance and while all issues are fixed, some need immediate assistance. (U.S. Air Force photo by Airman 1st Class Tiffany Del Oso)
Date Taken: | 07.12.2022 |
Date Posted: | 07.14.2022 14:33 |
Photo ID: | 7316558 |
VIRIN: | 220712-F-DB615-1002 |
Resolution: | 3653x5491 |
Size: | 3.24 MB |
Location: | TYNDALL AIR FORCE BASE, FLORIDA, US |
Web Views: | 49 |
Downloads: | 13 |
This work, Civil Engineering and what it takes to build an "Installation of the Future" [Image 4 of 4], by SrA Tiffany Del Oso, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.