Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Civil Engineering and what it takes to build an "Installation of the Future" [Image 2 of 4]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    Civil Engineering and what it takes to build an "Installation of the Future"

    TYNDALL AIR FORCE BASE, FLORIDA, UNITED STATES

    07.12.2022

    Photo by Airman 1st Class Tiffany Del Oso 

    325th Fighter Wing

    U.S. Air Force Senior Airman Zane Geiger, 325th Civil Engineer Squadron customer service operator, poses for a photo at Tyndall Air Force Base, Florida, July 12, 2022. Geiger manages service requests, prioritizes them and tasks the appropriate contractors from across the installation to ensure the mission never stops. (U.S. Air Force photo by Airman 1st Class Tiffany Del Oso)

    IMAGE INFO

    Date Taken: 07.12.2022
    Date Posted: 07.14.2022 14:33
    Photo ID: 7316557
    VIRIN: 220712-F-DB615-1040
    Resolution: 6048x4024
    Size: 3.21 MB
    Location: TYNDALL AIR FORCE BASE, FLORIDA, US

    Web Views: 35
    Downloads: 8

    PUBLIC DOMAIN