U.S. Air Force Senior Airman Zane Geiger, 325th Civil Engineer Squadron customer service operator, poses for a photo at Tyndall Air Force Base, Florida, July 12, 2022. Geiger manages service requests, prioritizes them and tasks the appropriate contractors from across the installation to ensure the mission never stops. (U.S. Air Force photo by Airman 1st Class Tiffany Del Oso)
Date Taken: | 07.12.2022 |
Date Posted: | 07.14.2022 14:33 |
Photo ID: | 7316557 |
VIRIN: | 220712-F-DB615-1040 |
Resolution: | 6048x4024 |
Size: | 3.21 MB |
Location: | TYNDALL AIR FORCE BASE, FLORIDA, US |
Web Views: | 35 |
Downloads: | 8 |
This work, Civil Engineering and what it takes to build an "Installation of the Future" [Image 4 of 4], by SrA Tiffany Del Oso, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.