Ridgecrest, CA - Building B of the Academic Training Building currently under construction with an estimated completion in summer 2023.
Date Taken: | 01.13.2023 |
Date Posted: | 02.14.2023 20:08 |
Photo ID: | 7619979 |
VIRIN: | 230113-N-RA951-3577 |
Resolution: | 5595x2833 |
Size: | 2.47 MB |
Location: | RIDGECREST, CALIFORNIA, US |
Web Views: | 157 |
Downloads: | 6 |
This work, OICC China Lake Completes 50 Percent of the Earthquake Recovery Program [Image 16 of 16], by LCDR Edward Cartagena, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.