Ridgecrest, CA - Grading operations of the 144-acre site of the six-project South Airfield Complex in December 2021.
Date Taken: | 12.15.2021 |
Date Posted: | 02.14.2023 20:08 |
Photo ID: | 7619980 |
VIRIN: | 211215-N-RA951-3902 |
Resolution: | 5187x1599 |
Size: | 1.36 MB |
Location: | RIDGECREST, CALIFORNIA, US |
Web Views: | 185 |
Downloads: | 6 |
This work, OICC China Lake Completes 50 Percent of the Earthquake Recovery Program [Image 16 of 16], by LCDR Edward Cartagena, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.