The newly constructed 53rd Weapons Evaluation Group (WEG) small boat facility is one of many construction projects included in the Tyndall AFB rebuild. The project is nearing completion and includes upgrades such as more fuel pumps, covered concrete boat docks with lifts for each vessel and a new boat ramp. The small boat facility also supports the mission-critical recovery of subscale aerial targets launched over the Gulf of Mexico. (U.S. Air Force photo by Christine Alombro Walker)
Date Taken: | 08.17.2023 |
Date Posted: | 09.08.2023 09:46 |
Photo ID: | 7993147 |
VIRIN: | 230809-F-QF062-1005 |
Resolution: | 6000x4000 |
Size: | 10.15 MB |
Location: | PANAMA CITY, FLORIDA, US |
Web Views: | 41 |
Downloads: | 3 |
This work, The 53rd WEG is also receiving a new upgraded small boat facility at Tyndall AFB [Image 6 of 6], by christine walker, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.