The Sam Rayburn Dam, as seen from lakeside. The Sam Rayburn Hydroelectric Power Plant was commissioned in September 1965. Even after a period of 58 years of operations, it still meets the electrical demands of Southeast Texas communities and regional area daily.
Date Taken: | 09.14.2023 |
Date Posted: | 10.13.2023 13:57 |
Photo ID: | 8070052 |
VIRIN: | 230914-A-XY212-1083 |
Resolution: | 6048x4024 |
Size: | 12.48 MB |
Location: | JASPER, TEXAS, US |
Web Views: | 65 |
Downloads: | 1 |
This work, Hydropower: Harnessing the Power of Water for a Sustainable Future [Image 4 of 4], by Patrick Adelmann, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.