Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Hydropower: Harnessing the Power of Water for a Sustainable Future [Image 2 of 4]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    Hydropower: Harnessing the Power of Water for a Sustainable Future

    JASPER, TEXAS, UNITED STATES

    09.15.2023

    Photo by Patrick Adelmann 

    U.S. Army Corps of Engineers, Fort Worth District

    The Angelina River below the Sam Rayburn Hydroelectric Power Plant and dam before and after the turbines are engaged for production of electricity. The Sam Rayburn Hydroelectric Power Plant was commissioned in September 1965. Even after a period of 58 years of operations, it still meets the electrical demands of Southeast Texas communities and regional area daily.

    IMAGE INFO

    Date Taken: 09.15.2023
    Date Posted: 10.13.2023 13:57
    Photo ID: 8070053
    VIRIN: 230915-A-XY212-1071
    Resolution: 1202x600
    Size: 2.24 MB
    Location: JASPER, TEXAS, US

    Web Views: 25
    Downloads: 1

    PUBLIC DOMAIN