The Angelina River below the Sam Rayburn Hydroelectric Power Plant and dam before and after the turbines are engaged for production of electricity. The Sam Rayburn Hydroelectric Power Plant was commissioned in September 1965. Even after a period of 58 years of operations, it still meets the electrical demands of Southeast Texas communities and regional area daily.
Date Taken: | 09.15.2023 |
Date Posted: | 10.13.2023 13:57 |
Photo ID: | 8070053 |
VIRIN: | 230915-A-XY212-1071 |
Resolution: | 1202x600 |
Size: | 2.24 MB |
Location: | JASPER, TEXAS, US |
Web Views: | 25 |
Downloads: | 1 |
This work, Hydropower: Harnessing the Power of Water for a Sustainable Future [Image 4 of 4], by Patrick Adelmann, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.