Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Hydropower: Harnessing the Power of Water for a Sustainable Future [Image 4 of 4]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    Hydropower: Harnessing the Power of Water for a Sustainable Future

    JASPER, TEXAS, UNITED STATES

    09.15.2023

    Photo by Patrick Adelmann 

    U.S. Army Corps of Engineers, Fort Worth District

    Michael Rogers, the senior mechanic at the Sam Rayburn Hydroelectric Power Plant, stands outside the entrance to the dam structure. The Sam Rayburn Hydroelectric Power Plant was commissioned in September 1965. Even after a period of 58 years of operations, it still meets the electrical demands of Southeast Texas communities and regional area daily.

    IMAGE INFO

    Date Taken: 09.15.2023
    Date Posted: 10.13.2023 13:57
    Photo ID: 8070055
    VIRIN: 230915-A-XY212-1078
    Resolution: 6048x4024
    Size: 10.96 MB
    Location: JASPER, TEXAS, US

    Web Views: 19
    Downloads: 1

    PUBLIC DOMAIN