2024 Project conceptual map of the proposed islands that will be created by building rock rings that are filled with dredge material on the Mississippi River located approximately eight miles upriver from Alton, IL, between Upper Mississippi River miles 208 and 210.
Date Taken: | 05.28.2024 |
Date Posted: | 07.23.2024 11:04 |
Photo ID: | 8545175 |
VIRIN: | 240528-A-A1415-1016 |
Resolution: | 1166x774 |
Size: | 258.27 KB |
Location: | ALTON, ILLINOIS, US |
Web Views: | 26 |
Downloads: | 4 |
This work, Piasa and Eagles Nest Habitat Rehabilitation and Enhancement Project Map [Image 5 of 5], by Janet Meredith, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.