A tow prepares to lock through the auxiliary lock chamber at Hannibal Locks and Dam on the Ohio River in Hannibal, Ohio, Sept. 13, 2024. The U.S. Army Corps of Engineers Pittsburgh District’s repair fleet continues maintenance and repair work within the facility’s dewatered primary lock chamber. The $16.6 million project involves removing and rebuilding four miter gates, replacing eight anchorages, and conducting full inspections and repairs for one of the busiest navigation facilities on the Ohio River. (U.S. Army Corps of Engineers Pittsburgh District photo by Andrew Byrne)
Date Taken: | 09.13.2024 |
Date Posted: | 09.27.2024 15:51 |
Photo ID: | 8666023 |
VIRIN: | 240913-A-XW512-1015 |
Resolution: | 8075x5383 |
Size: | 32.87 MB |
Location: | HANNIBAL, OHIO, US |
Web Views: | 19 |
Downloads: | 2 |
This work, From wear-and-tear to substantial repair: Pittsburgh District extends life of Hannibal Locks and Dam [Image 12 of 12], by Andrew Byrne, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.