Randall Lewis (right) an architect with the Gulf Region South Coast Corps of Eningeers looks over work being done at the Basra Children's Hospital in Basra, Iraq May 2. The GRSC engineers work with 9 Iraqi firms on various parts of the hospital with a projected opening of February 2009. The project is one of over 40 the GRSC works with in the Basra area.
Date Taken: | 05.06.2008 |
Date Posted: | 05.07.2012 07:18 |
Photo ID: | 88006 |
VIRIN: | 080512-A-1111S-002 |
Resolution: | 1960x3008 |
Size: | 2.38 MB |
Location: | BASRA, IQ |
Web Views: | 162 |
Downloads: | 22 |
This work, Rebuilding of Basra continues with the Army Corps of Engineers [Image 5 of 5], by SFC Christopher Sheely, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.