Part of the main entryway into the Basra children's hospital. The hospital is under construction with 9 Iraqi firms doing the work and being coordinated by the Gulf Region South Coast Corps of Engineers. GRSC visited the site May 2 to check on the progess the Iraqi construction firms are making. The hospital is to begin staffing in January 2009 and open to patients as a cancer treatment facility in February 2009.
Date Taken: | 05.06.2008 |
Date Posted: | 05.07.2012 08:01 |
Photo ID: | 88008 |
VIRIN: | 080512-A-1111S-004 |
Resolution: | 2106x1372 |
Size: | 1.32 MB |
Location: | BASRA, IQ |
Web Views: | 199 |
Downloads: | 24 |
This work, Rebuilding of Basra continues with the Army Corps of Engineers [Image 5 of 5], by SFC Christopher Sheely, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.