Builder 2nd Class Nino Hernandez-Navario, left, and Builder 1st Class (SCW) Craig Lawrence, of Naval Mobile Construction Battalion Two Five (NMCB-25), remove the sway bracing of a a Mabey-Johnson bridge during bridge construction training Feb. 25. The Mabey-Johnson is a prefabricated truss bridge designed for use by military engineering units. NMCB-25 is currently training for a scheduled deployment in support of Operation Enduring Freedom later this year. (U.S. Navy photo by Mass Communication Specialist 1st Class Patrick Gordon)
Date Taken: | 02.25.2014 |
Date Posted: | 02.27.2014 12:02 |
Photo ID: | 1175727 |
VIRIN: | 140225-N-JP566-023 |
Resolution: | 2240x1488 |
Size: | 1.91 MB |
Location: | GULFPORT, MISSISSIPPI, US |
Web Views: | 20 |
Downloads: | 9 |
This work, NMCB-25 Trains in Bridge Construction [Image 12 of 12], by CPO Patrick Gordon, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.