Steelworker 1st Class (SCW) John Corcoran, of Naval Mobile Construction Battalion Two Five (NMCB-25), installs a lift strap to remove a panel on a Mabey-Johnson bridge during bridge construction training Feb. 25. The Mabey-Johnson is a prefabricated truss bridge designed for use by military engineering units. NMCB-25 is currently training for a scheduled deployment in support of Operation Enduring Freedom later this year. (U.S. Navy photo by Mass Communication Specialist 1st Class Patrick Gordon)
Date Taken: | 02.25.2014 |
Date Posted: | 02.27.2014 11:59 |
Photo ID: | 1175733 |
VIRIN: | 140225-N-JP566-060 |
Resolution: | 1488x2240 |
Size: | 850.87 KB |
Location: | GULFPORT, MISSISSIPPI, US |
Web Views: | 25 |
Downloads: | 10 |
This work, NMCB-25 Trains in Bridge Construction [Image 12 of 12], by CPO Patrick Gordon, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.