Members of Naval Mobile Construction Battalion Two Five (NMCB-25) and NMCB-11 remove a transom cross girder from a Mabey-Johnson bridge during bridge construction training Feb. 25. The Mabey-Johnson is a pre-fabricated truss bridge designed for use by military engineering units. NMCB-25 is currently training for a scheduled deployment in support of Operation Enduring Freedom later this year. (U.S. Navy photo by Mass Communication Specialist 1st Class Patrick Gordon)
Date Taken: | 02.25.2014 |
Date Posted: | 02.27.2014 12:01 |
Photo ID: | 1175728 |
VIRIN: | 140225-N-JP566-028 |
Resolution: | 2083x1410 |
Size: | 1.55 MB |
Location: | GULFPORT, MISSISSIPPI, US |
Web Views: | 20 |
Downloads: | 8 |
This work, NMCB-25 Trains in Bridge Construction [Image 12 of 12], by CPO Patrick Gordon, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.