Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    NMCB-25 Trains in Bridge Construction [Image 12 of 12]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    NMCB-25 Trains in Bridge Construction

    Steelworker 1st Class (SCW) John Corcoran, of Naval Mobile Construction Battalion Two Five (NMCB-25), guides a 12K forklift operator to remove a panel on a Mabey-Johnson bridge during bridge construction training Feb. 25. The Mabey-Johnson is a pre-fabricated truss bridge designed for use by military engineering units. NMCB-25 is currently training for a scheduled deployment in support of Operation Enduring Freedom later this year. (U.S. Navy photo by Mass Communication Specialist 1st Class Patrick Gordon)

    IMAGE INFO

    Date Taken: 02.25.2014
    Date Posted: 02.27.2014 11:59
    Photo ID: 1175735
    VIRIN: 140225-N-JP566-072
    Resolution: 1488x2240
    Size: 1.06 MB
    Location: GULFPORT, MISSISSIPPI, US

    Web Views: 23
    Downloads: 9

    PUBLIC DOMAIN