Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Non-Federal Generator Operation and Maintenance Mission helps power critical water infrastructure in Puerto Rico [Image 1 of 5]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    Non-Federal Generator Operation and Maintenance Mission helps power critical water infrastructure in Puerto Rico

    Mike Bauman, from the U.S. Army Corps of Engineers Honolulu District, inspects a generator for a flood control pump near San Juan, Puerto Rico Dec. 27. Bauman has been working in Puerto Rico as a Quality Assurance technician for the Non-Federal Generator Operation and Maintenance mission since late October. He says the mission is challenging, but that it's "always rewarding to help and give back to these communities."

    IMAGE INFO

    Date Taken: 12.27.2017
    Date Posted: 12.29.2017 11:30
    Photo ID: 4057159
    VIRIN: 171227-O-JP287-483
    Resolution: 5472x3648
    Size: 8.04 MB
    Location: PR

    Web Views: 33
    Downloads: 7

    PUBLIC DOMAIN