Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Non-Federal Generator Operation and Maintenance Mission helps power critical water infrastructure in Puerto Rico [Image 3 of 5]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    Non-Federal Generator Operation and Maintenance Mission helps power critical water infrastructure in Puerto Rico

    These flood control pumps near San Juan, Puerto Rico are just one of the sites U.S. Army Corps of Engineers teams are visiting as part of a unique mission to repair local generators and keep critical infrastructure functioning in the aftermath of Hurricane Maria.

    IMAGE INFO

    Date Taken: 12.27.2017
    Date Posted: 12.29.2017 11:30
    Photo ID: 4057162
    VIRIN: 171227-O-JP287-691
    Resolution: 5472x3648
    Size: 9.5 MB
    Location: PR

    Web Views: 21
    Downloads: 7

    PUBLIC DOMAIN