Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Non-Federal Generator Operation and Maintenance Mission helps power critical water infrastructure in Puerto Rico [Image 4 of 5]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    Non-Federal Generator Operation and Maintenance Mission helps power critical water infrastructure in Puerto Rico

    Cody Mercer, a government contractor mechanic, works on repairing a generator that powers a flood control pump near San Juan, Puerto Rico Dec. 27. The repairs are part of the U.S. Army Corps of Engineers' Non-Federal Generator Operation and Maintenance mission in support of FEMA's Hurricane Maria recovery efforts.

    IMAGE INFO

    Date Taken: 12.27.2017
    Date Posted: 12.29.2017 11:31
    Photo ID: 4057169
    VIRIN: 171227-O-JP287-719
    Resolution: 5472x3648
    Size: 14.47 MB
    Location: PR

    Web Views: 32
    Downloads: 8

    PUBLIC DOMAIN