On-going concrete work for the taxiway from the main base area to the KC-46 'Pegasus' tanker maintenance campus shown on March 6, 2018, Tinker Air Force Base, Oklahoma. The concrete taxiways are being formed, poured and finished using an on-site concrete plant owned by the contractor. (U.S. Air Force photo/Greg L. Davis)
Date Taken: | 03.06.2018 |
Date Posted: | 03.22.2018 13:02 |
Photo ID: | 4238736 |
VIRIN: | 180306-F-VV898-006 |
Resolution: | 5577x3718 |
Size: | 5.52 MB |
Location: | OKLAHOMA CITY, OKLAHOMA, US |
Web Views: | 39 |
Downloads: | 12 |
This work, KC-46 maintenance campus construction progress [Image 25 of 25], by Greg L. Davis, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.