Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    KC-46 maintenance campus construction progress [Image 8 of 25]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    KC-46 maintenance campus construction progress

    OKLAHOMA CITY, OKLAHOMA, UNITED STATES

    03.06.2018

    Photo by Greg L. Davis 

    72nd Air Base Wing

    Holes are bored in to concrete sections where steel tie-in rods will be placed before the section of concrete is poured at the KC-46 'Pegasus' tanker maintenance campus March 6, 2018, Tinker Air Force Base, Oklahoma. The steel hangar structures are being erected and concrete taxiways are being poured and finished. (U.S. Air Force photo/Greg L. Davis)

    IMAGE INFO

    Date Taken: 03.06.2018
    Date Posted: 03.22.2018 13:04
    Photo ID: 4238747
    VIRIN: 180306-F-VV898-016
    Resolution: 5358x3572
    Size: 3.7 MB
    Location: OKLAHOMA CITY, OKLAHOMA, US

    Web Views: 22
    Downloads: 9

    PUBLIC DOMAIN