Steel beams which form the footing for Tinker's new air traffic control tower have been put in place and are being prepared to receive concrete by workers shown March 9, 2018, Tinker Air Force Base, Oklahoma. The new control tower will sit near the center of the airfield to provide controllers with a better vantage point and will incorporate modern technology and comforts. (U.S. Air Force photo/Greg L. Davis)
Date Taken: | 03.09.2018 |
Date Posted: | 03.22.2018 12:57 |
Photo ID: | 4238814 |
VIRIN: | 180309-F-VV898-024 |
Resolution: | 5366x3577 |
Size: | 4.27 MB |
Location: | OKLAHOMA CITY, OKLAHOMA, US |
Web Views: | 38 |
Downloads: | 9 |
This work, Tinker's new control tower footing in-place [Image 25 of 25], by Greg L. Davis, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.