Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    KC-46 maintenance campus construction progress [Image 20 of 25]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    KC-46 maintenance campus construction progress

    OKLAHOMA CITY, OKLAHOMA, UNITED STATES

    03.06.2018

    Photo by Greg L. Davis 

    72nd Air Base Wing

    A concrete plant used by the prime contactor is located near the construction site of the KC-46 'Pegasus' tanker maintenance campus and shown in operation March 6, 2018, Tinker Air Force Base, Oklahoma. Currently steel hangar structures are being erected and concrete taxiways are being poured and finished. (U.S. Air Force photo/Greg L. Davis)

    IMAGE INFO

    Date Taken: 03.06.2018
    Date Posted: 03.22.2018 12:58
    Photo ID: 4238796
    VIRIN: 180306-F-VV898-050
    Resolution: 5347x3565
    Size: 2.7 MB
    Location: OKLAHOMA CITY, OKLAHOMA, US

    Web Views: 38
    Downloads: 10

    PUBLIC DOMAIN