A helicopter view of U.S. Army Corps of Engineers South Pacific Border District contractors place bollard-barriers on their foundation of the Yuma 3 project near the Barry M. Goldwater Range in Arizona on Aug. 5. USACE is providing direction and oversight for Department of Defense-funded construction of border barrier projects from California to Texas. These projects are being executed by USACE, as directed through the U.S. Army by the Secretary of Defense, in response to the Presidential national emergency declaration dated Feb. 15, 2019, requiring the use of the armed forces and authorizing the use of Section 2808 of Title 10, U.S. Code. (No one in this photo crossed the international border.) (U.S. Army photo by George F. Jozens)
Date Taken: | 08.05.2020 |
Date Posted: | 08.11.2020 17:58 |
Photo ID: | 6304769 |
VIRIN: | 200805-A-OV291-0720 |
Resolution: | 4990x1855 |
Size: | 6.71 MB |
Location: | LUKEVILLE, ARIZONA, US |
Web Views: | 50 |
Downloads: | 6 |
This work, Placing the barrier [Image 9 of 9], by George F. Jozens, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.