TINIAN, Commonwealth of Northern Mariana Islands (April 8, 2021) Seabees, assigned to Naval Mobile Construction Battalion (NMCB) 4, and Marines, assigned to 7th Engineering Support Battalion (ESB), finish concrete for a mooring bollard footer at Tinian Harbor. The repair project enhances the Port of Tinian for future operations. NMCB- 4 is forward deployed throughout the Indo-Pacific region, ready to support major combat operations, theater security, humanitarian assistance and disaster relief operations. Seabees provide general engineering and civil support to the Navy, Marine Corps and joint operational forces globally. (U.S. Navy photo by Construction Mechanic 2nd Class Wenhan Fan/Released)
Date Taken: | 04.08.2021 |
Date Posted: | 05.12.2021 11:44 |
Photo ID: | 6640624 |
VIRIN: | 210408-N-WS023-1348 |
Resolution: | 4032x3024 |
Size: | 4.22 MB |
Location: | MP |
Web Views: | 19 |
Downloads: | 4 |
This work, Mooring Bollard Concrete Finishing [Image 9 of 9], by PO2 Wenhan Fan, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.