Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Mooring Bollard Concrete Placement [Image 9 of 9]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    Mooring Bollard Concrete Placement

    TINIAN, Commonwealth of Northern Mariana Islands (April 8, 2021) Lance Cpl. Martin Martinez (right), assigned to 7th Engineering Support Battalion (ESB), and Builder Constructionman Alexander Brienen, assigned to Naval Mobile Construction Battalion (NMCB) 4, utilize a concrete vibrator to ensure the concrete is evenly spread throughout a mooring bollard footer at the Tinian Harbor. The repair project enhances the Port of Tinian for future operations. NMCB- 4 is forward deployed throughout the Indo-Pacific region, ready to support major combat operations, theater security, humanitarian assistance and disaster relief operations. Seabees provide general engineering and civil support to the Navy, Marine Corps and joint operational forces globally. (U.S. Navy photo by Construction Mechanic 2nd Class Wenhan Fan/Released)

    IMAGE INFO

    Date Taken: 04.08.2021
    Date Posted: 05.12.2021 10:48
    Photo ID: 6640631
    VIRIN: 210408-N-WS023-1327
    Resolution: 4032x3024
    Size: 3.23 MB
    Location: MP

    Web Views: 72
    Downloads: 6

    PUBLIC DOMAIN