One of five, 124-foot girders is delivered to Onslow Beach on Marine Corps Base Camp Lejeune, March 8, 2023. The five girders will be lifted into place, allowing for the removal of the temporary bridge on the island side of the Atlantic Intracoastal Waterway. Due to damage from Hurricane Florence, the 70-year-old swing bridge at Onslow Beach is being replaced by a single leaf Bascule bridge (levered vertical platform) with a projected completion date in the spring of 2025. The bridge replacement is part of the overall Task Force Florence hurricane reconstruction project. (U.S. Marine Corps photo by Cpl. Jennifer E. Douds)
Date Taken: | 03.07.2023 |
Date Posted: | 03.21.2023 10:16 |
Photo ID: | 7691399 |
VIRIN: | 230307-M-PK533-3010 |
Resolution: | 5333x3000 |
Size: | 8.51 MB |
Location: | JACKSONVILLE, NORTH CAROLINA, US |
Web Views: | 224 |
Downloads: | 5 |
This work, Onslow Beach Bridge Construction [Image 10 of 10], by Cpl Jennifer E. Reyes, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.