Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Onslow Beach Bridge Construction [Image 4 of 10]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    Onslow Beach Bridge Construction

    JACKSONVILLE, NORTH CAROLINA, UNITED STATES

    03.07.2023

    Photo by Cpl. Jennifer E. Reyes 

    Marine Corps Installations East       

    A contractor guides the rigging into place to secure the girder before it is lifted onto the newly constructed Onslow Beach Bridge on Marine Corps Base Camp Lejeune, March 8, 2023. The five girders will be lifted into place, allowing for the removal of the temporary bridge on the island side of the Atlantic Intracoastal Waterway. Due to damage from Hurricane Florence, the 70-year-old swing bridge at Onslow Beach is being replaced by a single leaf Bascule bridge (levered vertical platform) with a projected completion date in the spring of 2025. The bridge replacement is part of the overall Task Force Florence hurricane reconstruction project. (U.S. Marine Corps photo by Cpl. Jennifer E. Douds)

    IMAGE INFO

    Date Taken: 03.07.2023
    Date Posted: 03.21.2023 10:16
    Photo ID: 7691405
    VIRIN: 230307-M-PK533-3011
    Resolution: 4704x7053
    Size: 15.92 MB
    Location: JACKSONVILLE, NORTH CAROLINA, US

    Web Views: 96
    Downloads: 5

    PUBLIC DOMAIN