A derrick boat with a crane sits docked in the Port of Buffalo, waiting to move out to a job site where it will construct a stone breakwater in Buffalo, N.Y., Oct. 13, 2023. The breakwater will contain sediment dredged from the Buffalo River, to form the base of a new wetland ecosystem in the abandoned Shipping Slip 3 on the city’s Outer Harbor. (U.S. Army photo by Avery Schneider)
Date Taken: | 10.13.2023 |
Date Posted: | 10.24.2023 23:00 |
Photo ID: | 8087759 |
VIRIN: | 231013-A-HB296-1004 |
Resolution: | 4000x2252 |
Size: | 6.35 MB |
Location: | BUFFALO, NEW YORK, US |
Web Views: | 9 |
Downloads: | 3 |
This work, Buffalo Outer Harbor Wetland Ecosystem Phase I Construction [Image 19 of 19], by Avery Schneider, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.