Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Buffalo Outer Harbor Wetland Ecosystem Phase I Construction [Image 5 of 19]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    Buffalo Outer Harbor Wetland Ecosystem Phase I Construction

    BUFFALO, NEW YORK, UNITED STATES

    10.13.2023

    Photo by Avery Schneider 

    U.S. Army Corps of Engineers, Buffalo District

    A barge full of loose stone sits docked in the Port of Buffalo, waiting to move out to a job site where it will be used to construct a stone breakwater in Buffalo, N.Y., Oct. 13, 2023. The breakwater will contain sediment dredged from the Buffalo River, to form the base of a new wetland ecosystem in the abandoned Shipping Slip 3 on the city’s Outer Harbor. (U.S. Army photo by Avery Schneider)

    IMAGE INFO

    Date Taken: 10.13.2023
    Date Posted: 10.24.2023 23:00
    Photo ID: 8087760
    VIRIN: 231013-A-HB296-1005
    Resolution: 4000x2252
    Size: 2.92 MB
    Location: BUFFALO, NEW YORK, US

    Web Views: 20
    Downloads: 3

    PUBLIC DOMAIN