Water flows calmly in and out of an abandoned shipping slip next to the Wilkeson Pointe park and kayak launch on the Outer Harbor of Buffalo, N.Y., Oct. 13, 2023. The U.S. Army Corps of Engineers is building a new wetland ecosystem here using a stone breakwater and sediment dredged from the Buffalo River. (U.S. Army photo by Avery Schneider)
Date Taken: | 10.15.2023 |
Date Posted: | 10.24.2023 23:00 |
Photo ID: | 8087761 |
VIRIN: | 231015-A-HB296-1001 |
Resolution: | 8256x5504 |
Size: | 10.31 MB |
Location: | BUFFALO, NEW YORK, US |
Web Views: | 6 |
Downloads: | 3 |
This work, Buffalo Outer Harbor Wetland Ecosystem Phase I Construction [Image 19 of 19], by Avery Schneider, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.