The view across the park at Wilkeson Pointe, looking to the abandoned adjacent Shipping Slip 3 in Buffalo, N.Y. The U.S. Army Corps of Engineers is building a new wetland ecosystem here using a stone breakwater and sediment dredged from the Buffalo River. (U.S. Army photo by Avery Schneider)
Date Taken: | 10.15.2023 |
Date Posted: | 10.24.2023 23:00 |
Photo ID: | 8087763 |
VIRIN: | 231015-A-HB296-1004 |
Resolution: | 8256x5504 |
Size: | 11.74 MB |
Location: | BUFFALO, NEW YORK, US |
Web Views: | 8 |
Downloads: | 3 |
This work, Buffalo Outer Harbor Wetland Ecosystem Phase I Construction [Image 19 of 19], by Avery Schneider, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.