Sompatana (Tommy) Phisayavong, a Defense POW/MIA Accounting Agency (DPAA) linguist, carries a bamboo stick during a DPAA recovery operation in the Lao People’s Democratic Republic (Lao PDR), Oct. 29, 2023. Onsite construction is conducted by recovery members and local Lao nationals when building wet screens, rest stations and other necessary structures for recovery operations. There are currently 277 recoverable missing personnel from the Vietnam War whose remains are believed to be in Lao PDR. (U.S. Navy photo by Mass Communication Specialist 2nd Class Annaliss Candelaria)
Date Taken: | 10.29.2023 |
Date Posted: | 12.13.2023 08:28 |
Photo ID: | 8149078 |
VIRIN: | 231029-N-BW566-1118 |
Resolution: | 7360x4912 |
Size: | 1.94 MB |
Location: | LA |
Web Views: | 60 |
Downloads: | 2 |
This work, DPAA recovery mission in Lao People's Democratic Republic 2023 [Image 33 of 33], by PO1 Annaliss Candelaria, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.