Contractors submerge materials during construction to repair the Chicago Harbor Lock floor during the off-season.
Date Taken: | 12.20.2023 |
Date Posted: | 12.27.2023 16:14 |
Photo ID: | 8182030 |
VIRIN: | 231220-O-JV047-8839 |
Resolution: | 1620x1080 |
Size: | 522.77 KB |
Location: | CHICAGO, ILLINOIS, US |
Web Views: | 24 |
Downloads: | 2 |
This work, Construction crew lowers material to divers as they repair the USACE Chicago Harbor Lock floor [Image 6 of 6], by Emily Helton, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.