Contractors use cranes as they continue construction to repair the Chicago Harbor Lock floor during the off-season.
Date Taken: | 12.20.2023 |
Date Posted: | 12.27.2023 16:14 |
Photo ID: | 8182033 |
VIRIN: | 231220-O-JV047-4818 |
Resolution: | 3024x4032 |
Size: | 1.88 MB |
Location: | CHICAGO, ILLINOIS, US |
Web Views: | 24 |
Downloads: | 2 |
This work, Construction of the lock floor continues at the USACE Chicago Harbor Lock [Image 6 of 6], by Emily Helton, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.