Equipment waiting to be used on construction of the lock floor at the USACE Chicago Harbor Lock. Dredging is done to remove excess material from the lock.
Date Taken: | 12.20.2023 |
Date Posted: | 12.27.2023 16:14 |
Photo ID: | 8182031 |
VIRIN: | 231220-O-JV047-8215 |
Resolution: | 1620x1080 |
Size: | 449.54 KB |
Location: | CHICAGO, ILLINOIS, US |
Web Views: | 21 |
Downloads: | 3 |
This work, Equipment waiting to be used on construction of the lock floor at the USACE Chicago Harbor Lock [Image 6 of 6], by Emily Helton, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.