(Left) Lt. Audrey S. Griffith from the 92nd Engineer Battalion, briefs the Col. Simon Stuart, commander Combined Team Uruzgan, (2nd Right) on the progress of the deconstruction of Forward Operating Base Hadrian.
Date Taken: | 05.30.2013 |
Date Posted: | 06.04.2013 12:14 |
Photo ID: | 946100 |
VIRIN: | 130530-A-MD709-038 |
Resolution: | 3600x2400 |
Size: | 1.08 MB |
Location: | DEH RAWUD, AF |
Web Views: | 166 |
Downloads: | 7 |
This work, FOB Hadrian Deconstruction on Schedule [Image 11 of 11], by OR-5 Mark Doran, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.