Col. Simon Stuart, Commander Combined Team Uruzgan (CTU), inspects the gym at Forward Operating Base Hadrian which will be the last coalition base to be deconstructed in Uruzgan.
Date Taken: | 05.30.2013 |
Date Posted: | 06.04.2013 12:00 |
Photo ID: | 946106 |
VIRIN: | 130530-A-MD709-082 |
Resolution: | 2400x3600 |
Size: | 981.82 KB |
Location: | DEH RAWUD, AF |
Web Views: | 105 |
Downloads: | 7 |
This work, FOB Hadrian Deconstruction on Schedule [Image 11 of 11], by OR-5 Mark Doran, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.