Col. Simon Stuart, commander Combined Team Uruzgan,(Centre) and Capt. Johnothan W. Erwin, commander Bravo Battery, 1st Battalion, 9th Field Artillery, 2nd Armored Brigade Combat Team inspect the security at Forward Operating Base Hadrian which will be the last coalition base to be deconstructed in Uruzgan.
Date Taken: | 05.30.2013 |
Date Posted: | 06.04.2013 12:17 |
Photo ID: | 946103 |
VIRIN: | 130530-A-MD709-052 |
Resolution: | 3600x2400 |
Size: | 1.2 MB |
Location: | DEH RAWUD, AF |
Web Views: | 107 |
Downloads: | 8 |
This work, FOB Hadrian Deconstruction on Schedule [Image 11 of 11], by OR-5 Mark Doran, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.