160627-N-YL257-001 PORTSMOUTH, Va. (June 27, 2016) Aviation Boatswain's Mate (Handling) 3rd Class Andrew Fabrizio repairs a spigot on a countermeasure wash-down pipe aboard the aircraft carrier USS George H.W. Bush (CVN 77). GHWB is undergoing a planned incremental availability period at Norfolk Naval Shipyard. (U.S. Navy photo by Mass Communication Specialist 3rd Class Christopher D. Gaines/Released)
Date Taken: | 06.27.2016 |
Date Posted: | 07.06.2016 00:02 |
Photo ID: | 2705900 |
VIRIN: | 160627-N-YL257-001 |
Resolution: | 4004x2664 |
Size: | 1.03 MB |
Location: | USS GEORGE H.W. BUSH, N/A, US |
Web Views: | 12 |
Downloads: | 34 |
This work, George H.W. Bush is undergoing a planned incremental availability period at Norfolk Naval Shipyard. [Image 307 of 307], by PO2 Christopher Gaines, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.