160628-N-YL257-014 PORTSMOUTH, Va. (June 28, 2016) Aviation Support Equipment Technician 3rd Class Ranson Bullard repairs the vacuum adapter on a flight deck scrubber aboard the aircraft carrier USS George H.W. Bush (CVN 77). A flight deck scrubber removes debris and foreign object damage from the flight deck. GHWB is undergoing a planned incremental availability period at Norfolk Naval Shipyard. (U.S. Navy photo by Mass Communication Specialist 3rd Class Christopher D. Gaines/Released)
Date Taken: | 06.28.2016 |
Date Posted: | 07.06.2016 00:07 |
Photo ID: | 2706164 |
VIRIN: | 160628-N-YL257-014 |
Resolution: | 4148x2760 |
Size: | 886.15 KB |
Location: | USS GEORGE H.W. BUSH, N/A, US |
Web Views: | 10 |
Downloads: | 34 |
This work, George H.W. Bush is undergoing a planned incremental availability period at Norfolk Naval Shipyard. [Image 307 of 307], by PO2 Christopher Gaines, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.