160628-N-YL257-010 PORTSMOUTH, Va. (June 28, 2016) Aviation Support Equipment Technician 3rd Class Ranson Bullard looks for the proper tools to use for maintenance on a laptop aboard the aircraft carrier USS George H.W. Bush (CVN 77). GHWB is undergoing a planned incremental availability period at Norfolk Naval Shipyard. (U.S. Navy photo by Mass Communication Specialist 3rd Class Christopher D. Gaines/Released)
Date Taken: | 06.28.2016 |
Date Posted: | 07.06.2016 00:06 |
Photo ID: | 2706101 |
VIRIN: | 160628-N-YL257-010 |
Resolution: | 3838x2554 |
Size: | 1.04 MB |
Location: | USS GEORGE H.W. BUSH, N/A, US |
Web Views: | 16 |
Downloads: | 37 |
This work, George H.W. Bush is undergoing a planned incremental availability period at Norfolk Naval Shipyard. [Image 307 of 307], by PO2 Christopher Gaines, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.