FINEGAYAN, Guam (Jan. 22, 2025) - Capt. Blake Burket, the commanding officer of the Office in Charge of Construction (OICC) discusses flooring installation issues with staff during the site walk of a building nearing completion.
Before a building can be delivered to the end user, OICC MCM staff enter an extensive closeout phase known as the 'Red Zone'. The Red Zone phase is a collaborative process between contractors, sub-contractors, and construction managers. In the Red Zone, contractors, engineers, and experts from key aspects of the building design will walk the project site together to check their work. The collaboration helps to ensure the construction contract specifications have been met and resolve any issues.
Date Taken: | 01.22.2025 |
Date Posted: | 02.04.2025 19:44 |
Photo ID: | 8856090 |
VIRIN: | 250122-O-CM160-1003 |
Resolution: | 5847x3899 |
Size: | 3.7 MB |
Location: | GU |
Web Views: | 47 |
Downloads: | 1 |
This work, Capt. Blake Burket Discusses Quality Control with OICC Staff During a Site Walk [Image 14 of 14], by Rachel Landers, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.