Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Military and Civilian Staff with the Office in Charge of Construction Point out a Defect in Floor Installation [Image 14 of 14]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    Military and Civilian Staff with the Office in Charge of Construction Point out a Defect in Floor Installation

    FINEGAYAN, Guam (Jan. 22, 2025) - Staff with the Office in Charge of Construction (OICC) note installation defects with a newly completed floor on Marine Corps Base Camp Blaz. The floor was installed in a building nearing turnover but has a few defects that need to be addressed before the building can be delivered.

    OICC MCM staff discussed the concern during an extensive closeout phase known as the 'Red Zone'. The Red Zone phase is a collaborative process between contractors, sub-contractors, and construction managers. In the Red Zone, contractors, engineers, and experts from key aspects of the building design will walk the project site together to check their work. The collaboration helps to ensure the construction contract specifications have been met and resolve any issues.

    IMAGE INFO

    Date Taken: 01.22.2025
    Date Posted: 02.04.2025 19:44
    Photo ID: 8856101
    VIRIN: 250122-O-CM160-1004
    Resolution: 6000x4000
    Size: 8.95 MB
    Location: GU

    Web Views: 53
    Downloads: 1

    PUBLIC DOMAIN