U.S. Navy Seabees, assigned to Underwater Construction Team (UCT) 2, oversee pile driving operations in Dili Harbor, Timor Leste on March 7, 2018. UCT 2 is leading an effort with Naval Mobile Construction Battalion 4 and Timor-Leste National Police’s Maritime Police Unit to construct a steel pile pier to increase small boat berthing in support of maritime security operations. UCT 2 specializes in the construction, inspection, maintenance, and repair of underwater and waterfront facilities in support of the Pacific Fleet. (U.S. Navy photo by Lt. Michael Roster, CEC, USN)
Date Taken: | 03.07.2018 |
Date Posted: | 03.28.2018 17:06 |
Photo ID: | 4251355 |
VIRIN: | 180307-N-PF688-001 |
Resolution: | 2208x1242 |
Size: | 226.19 KB |
Location: | DILI, TL |
Web Views: | 54 |
Downloads: | 10 |
This work, UCT 2 Constructs Pier for Timor Leste Maritime Police [Image 10 of 10], by LT Matthew Evans, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.