U.S. Navy Lt. Michael Roster, assigned to Underwater Construction Team (UCT) 2, briefs Superintendent Lino da Silva Saldanha, with Timor Leste National Police, and U.S. Deputy Chief of Mission Dan Bichoff in Dili, Timor Leste on March 14, 2018. UCT 2 is leading an effort with Naval Mobile Construction Battalion 4 and Timor-Leste National Police’s Maritime Police Unit to construct a steel pile pier to increase small boat berthing in support of maritime security operations. UCT 2 specializes in the construction, inspection, maintenance, and repair of underwater and waterfront facilities in support of the Pacific Fleet. (U.S. Navy photo by Construction Mechanic 2nd Class Robert Norton)
Date Taken: | 03.14.2018 |
Date Posted: | 03.28.2018 17:07 |
Photo ID: | 4251365 |
VIRIN: | 180314-N-PF688-001 |
Resolution: | 1296x864 |
Size: | 249.87 KB |
Location: | DILI, TL |
Web Views: | 118 |
Downloads: | 11 |
This work, UCT 2 Constructs Pier for Timor Leste Maritime Police [Image 10 of 10], by LT Matthew Evans, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.